Your Development Approval Checklist

Are you a small-medium developer or owner-builder gearing up for a Development Application (DA)?

Streamline your DA process with JC Engineers Pre-DA Engineering Checklist! Tailored for Australian projects, this checklist ensures your engineering requirements—site surveys, structural plans, stormwater management, and more—are DA-ready. Avoid costly delays, meet council standards, and get your project approved faster.

Use our free checklist below and take the first step toward a seamless DA submission!

1. Site Survey & Geotechnical Report

  • Obtain a detailed site survey: Include boundaries, levels, existing structures, and utilities (e.g., stormwater, sewer lines).

  • Commission a geotechnical investigation: Confirm soil type, bearing capacity, and any risks (e.g., erosion, slippage, or contamination).

  • Why? These inform foundation design and ensure compliance with local council requirements.

2. Structural Engineering Scope

  • Define your project’s structural needs: Identify load-bearing elements, materials (e.g., concrete, steel, timber), and any special features (e.g., cantilevered designs).

  • Engage a structural engineer early: Get preliminary advice to align with architectural plans.

  • Pro Tip: Early engineer input prevents costly redesigns during DA review.

3. Stormwater & Drainage Plan

  • Map existing drainage systems: Check how water flows on and off your site.

  • Plan stormwater management: Ensure compliance with council’s water-sensitive urban design (WSUD) policies (e.g., detention tanks, raingardens).

  • Consult a hydraulic engineer: Confirm pipe sizes, drainage routes, and flood risk mitigation.

  • Why? Poor drainage plans are a common DA rejection reason.

4. Traffic & Access Engineering

  • Assess vehicle access: Confirm driveways, parking, and turning circles meet council standards.

  • Check pedestrian safety: Ensure pathways comply with accessibility requirements.

  • Prepare a traffic impact statement (if required): For larger projects, engage a traffic engineer to analyse local road impacts.

  • Note: Small projects may only need basic access plans, but check council guidelines.

5. Environmental & Energy Compliance

  • Review BASIX/Nathers requirements: Ensure your design meets energy efficiency standards.

  • Address environmental constraints: Check for bushfire, flood, or heritage overlays requiring special engineering solutions.

  • Consider sustainable engineering options: E.g., solar passive design or recycled materials.

  • Why? Councils prioritise sustainability in DA assessments.

6. Engineering Documentation

  • Compile engineering drawings: Include structural, hydraulic, and civil plans as required.

  • Ensure compliance with Australian Standards: E.g., AS 2870 for residential slabs, AS 4100 for steel structures.

  • Get engineer certifications: Most councils require sign-offs from qualified engineers.

  • Pro Tip: Use a checklist provided by your local council to cross-check requirements.

7. Coordinate with Other Consultants

  • Align with your architect/planner: Ensure engineering plans integrate with architectural drawings.

  • Check DA submission deadlines: Confirm all engineering reports are ready for lodgment.

  • Budget for engineering fees: Factor in costs for reports, certifications, and revisions.

  • Why? Misaligned plans or missing documents delay DA approvals.

8. Pre-Submission Review

  • Double-check council’s DA guidelines: Each local government has unique engineering requirements.

  • Conduct a self-audit: Use a DA lodgment checklist (often available on council websites).

  • Consider a pre-DA meeting: Book a consultation with council planners to flag potential issues.

  • Note: Pre-DA meetings are especially helpful for complex or non-standard projects.

Why Choose JC Engineers?

Expertise You Can Trust: Our experienced engineers specialise in DA-compliant solutions for small-medium developments.

Tailored Support: We provide personalised advice to suit your project’s unique needs, from concept to approval.

Proven Track Record: Hundreds of successful DA submissions across Australia, minimizing rejections and delays.

Cost-Effective Solutions: Save time and money with our efficient, practical engineering plans.

Local Knowledge: Deep understanding of Australian council requirements and standards.

Get Started Today

Don’t leave your project to chance. Contact our team for a tailored approach to your development project.